PakNEV
← Cars

Mercedes-Benz · SUV · Battery Electric

EQA

N/A

EQA
EV

Standard

PKR 1.75 Cr
Ex-factory
190hp
Power
5.6sec
0–100 km/h
66.5kWh
Battery capacity
525km
Range

Battery & charging

Battery
66.5 kWh
Claimed range
525 km (WLTP)
Consumption
13.4 kWh/100km
Max AC charge
11 kW
Max DC charge
100 kW
DC 10–80%
35 min

Performance

Power
190 hp
Torque
520 Nm
0–100 km/h
5.6 s
Top speed
160 km/h

Dimensions

Seats
5
Boot
500 L
Length
4,463 mm
Width
1,834 mm
Height
2,020 mm
Wheelbase
2,729 mm
Kerb weight
2,045 kg

On-road price estimate

Ex-factory price plus registration, taxes and fees for FY 2026-27.

Standard

Rs 18,046,425
est. on-road
Ex-factory price
Rs 17,500,000
Registration fee(95% EV exemption applied to the 2% car slab - Punjab publishes no cc-equivalence for EVs; confirm at excise office.)
Rs 17,500
Token tax (year 1)(95% EV exemption on the 0.3% slab. A 99% exemption for FY2026-27 was reported in Jul 2026 news - official page still shows 95%.)
Rs 2,625
Smart card
Rs 1,300
Advance income tax (s.231B)(EV rule: engine capacity n/a and value ≥ Rs 5M → 3% of value. Non-filer uplift per Tenth Schedule, not explicitly restated for this proviso.)
Rs 525,000

Estimates from official FY 2026-27 schedules; actual invoices vary by excise office, dealer charges and notification changes. Token tax shown is the first year only.

What it costs to run

Against a typical petrol car at 8.5 L/100km. Adjust to your own driving.

VariantEnergyCost / monthYou save / month
StandardElectricRs 12,060Rs 25,875

Estimates only. Electric figures assume home/AC charging at the rate above; real cost varies with driving and charging source.

Where to charge

Type 2 / CCS2

The EQA charges on Type 2 / CCS2. 154 of 163 mapped public stations can charge it.

You may consider

Cars in a similar class and budget, with what each one trades off against the EQA.