PakNEV
← Cars

GWM ORA · Sedan · Battery Electric

ORA 07

FWD from PKR 15.3M; AWD from PKR 17.5M

Ora-7
EV

FWD (Front-Wheel Drive)

PKR 1.53 Cr
Ex-factory
201hp
Front-wheel drive
8.2sec
0–100 km/h
83.5kWh
Battery capacity
420km
Real-world range

Battery & charging

Battery
83.5 kWh
Claimed range
570 km (WLTP)
Real-world est.
420 km
Consumption
16 kWh/100km
Max AC charge
11 kW
Max DC charge
88 kW
DC 10–80%
37 min

Performance

Power
201 hp
Torque
340 Nm
Drivetrain
FWD
0–100 km/h
8.2 s
Top speed
170 km/h
Warranty
5 yrs / 150,000 km vehicle, 8 yrs / 150,000 km battery

Dimensions

Seats
5
Boot
333 L
Length
4,871 mm
Width
1,862 mm
Height
1,500 mm
Wheelbase
2,870 mm
Kerb weight
1,990 kg

On-road price estimate

Ex-factory price plus registration, taxes and fees for FY 2026-27.

FWD (Front-Wheel Drive)

Rs 15,777,895
est. on-road
Ex-factory price
Rs 15,300,000
Registration fee(95% EV exemption applied to the 2% car slab - Punjab publishes no cc-equivalence for EVs; confirm at excise office.)
Rs 15,300
Token tax (year 1)(95% EV exemption on the 0.3% slab. A 99% exemption for FY2026-27 was reported in Jul 2026 news - official page still shows 95%.)
Rs 2,295
Smart card
Rs 1,300
Advance income tax (s.231B)(EV rule: engine capacity n/a and value ≥ Rs 5M → 3% of value. Non-filer uplift per Tenth Schedule, not explicitly restated for this proviso.)
Rs 459,000

AWD (All-Wheel Drive / Performance)

Rs 18,046,425
est. on-road
Ex-factory price
Rs 17,500,000
Registration fee(95% EV exemption applied to the 2% car slab - Punjab publishes no cc-equivalence for EVs; confirm at excise office.)
Rs 17,500
Token tax (year 1)(95% EV exemption on the 0.3% slab. A 99% exemption for FY2026-27 was reported in Jul 2026 news - official page still shows 95%.)
Rs 2,625
Smart card
Rs 1,300
Advance income tax (s.231B)(EV rule: engine capacity n/a and value ≥ Rs 5M → 3% of value. Non-filer uplift per Tenth Schedule, not explicitly restated for this proviso.)
Rs 525,000

Estimates from official FY 2026-27 schedules; actual invoices vary by excise office, dealer charges and notification changes. Token tax shown is the first year only.

What it costs to run

Against a typical petrol car at 8.5 L/100km. Adjust to your own driving.

VariantEnergyCost / monthYou save / month
FWD (Front-Wheel Drive)ElectricRs 14,400Rs 23,535
AWD (All-Wheel Drive / Performance)ElectricRs 15,750Rs 22,185

Estimates only. Electric figures assume home/AC charging at the rate above; real cost varies with driving and charging source.

Where to charge

Type 2 / CCS2

The ORA 07 charges on Type 2 / CCS2. 154 of 163 mapped public stations can charge it.

You may consider

Cars in a similar class and budget, with what each one trades off against the ORA 07.