PakNEV
← Cars

GAC Aion · Hatchback · Battery Electric

Aion UT

N/A

UT
EV

GAC Aion UT

PKR 63.99 Lakh
Ex-factory
134hp
Front-wheel drive
11.4sec
0–100 km/h
44.12kWh
Battery capacity
400km
Range

Battery & charging

Battery
44.12 kWh
Claimed range
400 km (CLTC)
Consumption
11.03 kWh/100km
Max AC charge
6.6 kW
Max DC charge
64 kW
DC 10–80%
40 min

Performance

Power
134 hp
Torque
145 Nm
Drivetrain
FWD
0–100 km/h
11.4 s
Top speed
150 km/h
Warranty
8 yrs / 160,000 km vehicle; 8 yrs / 200,000 km battery

Dimensions

Seats
5
Boot
321 L
Length
4,270 mm
Width
1,880 mm
Height
1,575 mm
Wheelbase
2,750 mm
Kerb weight
1,540 kg

On-road price estimate

Ex-factory price plus registration, taxes and fees for FY 2026-27.

GAC Aion UT

Rs 6,599,629
est. on-road
Ex-factory price
Rs 6,399,000
Registration fee(95% EV exemption applied to the 2% car slab - Punjab publishes no cc-equivalence for EVs; confirm at excise office.)
Rs 6,399
Token tax (year 1)(95% EV exemption on the 0.3% slab. A 99% exemption for FY2026-27 was reported in Jul 2026 news - official page still shows 95%.)
Rs 960
Smart card
Rs 1,300
Advance income tax (s.231B)(EV rule: engine capacity n/a and value ≥ Rs 5M → 3% of value. Non-filer uplift per Tenth Schedule, not explicitly restated for this proviso.)
Rs 191,970

Estimates from official FY 2026-27 schedules; actual invoices vary by excise office, dealer charges and notification changes. Token tax shown is the first year only.

What it costs to run

Against a typical petrol car at 8.5 L/100km. Adjust to your own driving.

VariantEnergyCost / monthYou save / month
GAC Aion UTElectricRs 9,927Rs 28,008

Estimates only. Electric figures assume home/AC charging at the rate above; real cost varies with driving and charging source.

Where to charge

Type 2 / CCS2

The Aion UT charges on Type 2 / CCS2. 154 of 163 mapped public stations can charge it.

You may consider

Cars in a similar class and budget, with what each one trades off against the Aion UT.